1: Choose the terms that should NOT be used in the technical writing
20s
Material
Stuff
Substance
Component
2: Choose the terms that should NOT be used in the technical writing
20s
Numerous
a lot
$ 118352
500 spots per square meter
3: Choose the terms that should NOT be used in the technical writing
20s
Thing
Device
Object
Element
4: Choose the terms that should NOT be used in the technical writing
20s
under 2 milliseconds
120 cycles per minute
with a speed of light
really quickly
5: Choose the terms that should NOT be used in the technical writing
20s
Quality engineer reported
We think it was wrong
The internal auditor found
EXT05 operator identified
6: Choose the terms that should NOT be used in the technical writing
20s
simple
2 component system
3 steps process
video instruction available
7: Choose the terms that should NOT be used in the technical writing
20s
capacity of 128 terabytes
5 mm long
1 mln eaches
huge
8: Choose the terms that should NOT be used in the technical writing
20s
innovative approach
upgraded software
modernized station
awesome new thing
9: Choose the terms that should NOT be used in the technical writing
20s
Last month
From 01/08/2024 to 30/08/2024
From 2024-08-01 to 2024-08-30
From 1 August 2024 to 30 August 2024
10: Choose the statement written in the technical writing
60s
Operators have lost the certificate for ruler on EXT05
During internal Non-Sterile Ostomy Production audit 2024-11-26/27 (IAR-01454) EXT05 area was reviewed and identified that operators are using calibrated ruler (M-968092) to measure Mix sheet. Calibration certificate for ruler was requested but could not be provided.
During internal Non-Sterile Ostomy Production audit 2024-11-26/27 (IAR-01454) nobody could find a calibration certificate for a lot of rulers
During internal No-Sterilic Ostomy Cell audit in November EXT05 area was rewatched and identificated that operators using calibrater ruler (M-968092) measure Mix sheet. Calibratering certificate for ruler requested but not be provided.